Bhilwara: The foremost Khari dam of Asind has overflowed after 27 years. After this move, the Khari river can be flowing at a fast velocity. The residents of the villages the place the Khari river is reaching are worshipping the river.
Subdivision officer Ummed Singh Rajawat mentioned that the catchment space of Khari Dam falls in Rajsamand district. This time resulting from good monsoon rains, Khari Dam of 21 toes filling capability acquired crammed to the brim. The water began flowing on Saturday morning. Its water reaches the primary Narayan Sagar Dam of Beawar district through Asind, Parasoli, Shambhugarh, Antali by means of Khari River.
Read: 10 gates of Parvati dam opened, flood menace on about 50 villages
The basis of Narayan Sagar Dam was laid by India’s first President Dr. Rajendra Prasad. Narayan Sagar Dam, which has a filling capability of 16 toes, at the moment has 11 toes of water resulting from water coming from Nekhadi River, however now resulting from filling of Khari Dam, the water of Khari River will attain Narayan Sagar Dam by night. In such a state of affairs, the hope of the folks of the realm has additionally been raised.
Water was welcomed with drums: The Khari river of the area is revered right here. The river acquired stuffed with water on Saturday as a result of overflowing of the Khari dam. As quickly because the water reached the river, the villagers reached the banks of the river singing auspicious songs to the tune of drums and worshipped the river by overlaying it with a chunari.