Friday, March 28, 2025
spot_imgspot_img

Top 5 This Week

spot_img

Related Posts

Big information associated to PKC-ERCP, feeder will probably be constructed from Isarda to Ramgarh Dam, Chambal water will attain in 4 years


Jaipur: Big information is being obtained associated to PKC-ERCP. Feeder will probably be constructed from Isarda to Ramgarh Dam. Chambal water will attain Ramgarh Dam in 4 years. Water will attain after touring about 120 kilometers. Main consuming water strains will probably be laid at three locations between Isarda and Ramgarh.

Water will probably be prolonged additional by way of the canal system at two locations on the way in which. Pickup wire and synthetic reserve wire can even be constructed on the way in which. 55 MQM Chambal water will probably be pumped from Isarda to Ramgarh. The estimated price of the work is Rs 1915 crore. The water provide division is getting ready for a prepared consuming water system.





Source link

Popular Articles