Tuesday, December 24, 2024
spot_imgspot_img

Top 5 This Week

spot_img

Related Posts

Due to heavy rains in Dausa, roads obtained eroded, many villages misplaced connectivity


Many villages misplaced connectivity (Video ETV Bharat Dausa)

Dausa : The rain that was persevering with for the final three days within the district stopped after the solar got here out on Monday. Due to heavy rain within the district, many low-lying areas had been submerged. Traffic has been disrupted because of erosion of roads because of water at many locations. Also, accidents have been narrowly averted because of waterlogging at many locations. In such a scenario, the district administration is consistently interesting to individuals to steer clear of waterlogged areas. At the identical time, a significant accident was narrowly averted in a pilgrimage going to Paplaj Mata on Monday.

Pedestrian swept away into Moral river after slipping: According to the villagers, a pilgrimage to Paplaj Mata was occurring foot from Banskho on Monday. During this time, as a result of quick circulation of Morel river close to Bidrakha highway positioned in Dugravata of the district, the devotee Hanuman son of Ramkumar Patan resident Banskho, who was concerned within the pilgrimage, misplaced his stability whereas making an attempt to avoid wasting his belongings. Due to slipping of his ft, the pilgrim began flowing within the river, however the individuals current on the spot confirmed promptness and jumped into the river and took the pilgrim out.

Read. Heavy rain alert in additional than 20 districts right now, school-office closed in Ajmer – Rajasthan Weather Update

Dozens of villages reduce off from communication: The culvert on the best way to Nangal Rajawatan within the district broke as a result of influx of water within the Bidrakha river, because of which connectivity of about 20 villages within the surrounding space has been reduce off. At the identical time, the uncooked anicut constructed by the villagers of Khanwas village in Lavan space has damaged because of heavy influx of water within the Morel river. Villager Kamlesh Meena mentioned that the villagers of about half a dozen villages had constructed the anicut in 10 days at a value of 5 lakh rupees, which broke final night time as a result of robust circulation of water within the Morel river.



Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Popular Articles